Question 1 of 30
In a multi-tenant VMware Cloud environment, you are tasked with designing a resource allocation strategy that ensures optimal performance while maintaining cost efficiency. Each tenant has varying workloads, with some requiring high CPU and memory resources, while others are more storage-intensive. Given that the total available resources are 100 CPU cores, 400 GB of RAM, and 10 TB of storage, how would you allocate these resources to maximize performance for a tenant with a workload requiring 20 CPU cores, 80 GB of RAM, and 2 TB of storage, while also ensuring that the remaining resources can adequately support other tenants?
Allocate 20 CPU cores, 80 GB of RAM, and 2 TB of storage to the tenant, leaving 80 CPU cores, 320 GB of RAM, and 8 TB of storage for other tenants.
Allocate 30 CPU cores, 100 GB of RAM, and 3 TB of storage to the tenant, leaving 70 CPU cores, 300 GB of RAM, and 7 TB of storage for other tenants.
Allocate 10 CPU cores, 50 GB of RAM, and 1 TB of storage to the tenant, leaving 90 CPU cores, 350 GB of RAM, and 9 TB of storage for other tenants.
Allocate 25 CPU cores, 90 GB of RAM, and 2.5 TB of storage to the tenant, leaving 75 CPU cores, 310 GB of RAM, and 7.5 TB of storage for other tenants.

Preparing for VMWare 3V0-32.21 Advanced Design VMware Cloud Management and Automation? Now land the interview.

73% of qualified candidates get rejected because of weak resumes. Build an ATS-optimized, recruiter-ready resume in under 5 minutes - free to start.

Build My Resume Free