Question 1 of 30
A company has implemented a disaster recovery plan that includes both on-site and off-site backups. They have a Recovery Time Objective (RTO) of 4 hours and a Recovery Point Objective (RPO) of 1 hour. After a significant data loss incident, the IT team needs to restore the system to its last known good state. If the last backup was taken 1 hour before the incident, and the restoration process takes 3 hours, what is the maximum allowable downtime for the company to meet its RTO and RPO requirements?
4 hours
5 hours
6 hours
7 hours

Preparing for Microsoft AZ-800 Administering Windows Server Hybrid Core Infrastructure? Now land the interview.

73% of qualified candidates get rejected because of weak resumes. Build an ATS-optimized, recruiter-ready resume in under 5 minutes - free to start.

Build My Resume Free