Question 1 of 30
A financial institution is developing a disaster recovery plan (DRP) to ensure business continuity in the event of a catastrophic failure. The institution has identified critical applications that must be restored within a specific timeframe to minimize financial loss. The Recovery Time Objective (RTO) for these applications is set at 4 hours, while the Recovery Point Objective (RPO) is established at 1 hour. If a disaster occurs at 2 PM, what is the latest time by which data must be restored to meet the RPO, and what is the maximum allowable downtime for the applications to meet the RTO?
Data must be restored by 3 PM, and downtime must not exceed 4 hours.
Data must be restored by 1 PM, and downtime must not exceed 2 hours.
Data must be restored by 4 PM, and downtime must not exceed 3 hours.
Data must be restored by 5 PM, and downtime must not exceed 1 hour.

Preparing for CISCO 500-901 Cisco Data Center Unified Computing Infrastructure Design? Now land the interview.

73% of qualified candidates get rejected because of weak resumes. Build an ATS-optimized, recruiter-ready resume in under 5 minutes - free to start.

Build My Resume Free