Question 1 of 30
In a data center utilizing Cisco ACI, a network engineer is troubleshooting a connectivity issue between two application endpoints. The engineer discovers that the endpoints are in different EPGs (Endpoint Groups) and that the contracts between these EPGs are not configured correctly. What steps should the engineer take to resolve this issue and ensure proper communication between the endpoints?
Create a contract that allows the necessary traffic between the two EPGs and apply it to both EPGs.
Modify the VLAN configuration on the switches to ensure both EPGs are on the same VLAN.
Increase the MTU size on the interfaces connecting the two EPGs to accommodate larger packets.
Implement a static route between the two EPGs to facilitate communication.

Preparing for CISCO 300-620 Implementing Cisco Application Centric Infrastructure (DCACI)? Now land the interview.

73% of qualified candidates get rejected because of weak resumes. Build an ATS-optimized, recruiter-ready resume in under 5 minutes - free to start.

Build My Resume Free